Product Description

The name of the service is Online TSS(Total Suspended Solid) Monitoring System in compliance with Public Utilities board, Singapore and Silt Imagery Detection System (SIDS).


What are the included items in this service?

This system includes the following

  •   Total Suspended Solid sensor
  •   Video camera to monitor the construction site water discharge
  •   Online access to item a and b (in compliance with Public Utilities board, Singapore and Silt Imagery Detection System)

What are the features of this online TSS monitoring system?

SMS alert to the construction site representative (ECO in most cases) when the suspended solid level exceeds 50 mg / l (in compliance with Public Utilities board, Singapore and Silt Imagery Detection System)

Email alerts to the construction site representatives (ECO and Project Manager in most cases) when the suspended solid level exceeds 50 mg / l (in compliance with Public Utilities board, Singapore and Silt Imagery Detection System)

SMS alert to the construction site representative (ECO in most cases) when the system is down for more than 15 minutes (in compliance with Public Utilities board, Singapore and Silt Imagery Detection System)

Email alert to the construction site representatives (ECO and Project Manager in most cases) when the system is down for more than 15 minutes (in compliance with Public Utilities board, Singapore and Silt Imagery Detection System)


Who need this service?

As per Public Utilities board, Singapore the main contractors (occupier) of the following construction sites shall mandatorily monitor their construction waste water at the public drain (using CCTV) near the discharge outlet of the construction site

  •   Construction sites with site area of 0.2 hectare and above
  •   Sites with problematic Earth Control Measure
  •   Sites within sensitive areas

As per Public Utilities board, Singapore the main contractors (occupier) of the Smaller sized sites (< 2000 square meter) shall mandatory be equipped with TSS system to check the discharge from their silt treatment plant (ECM unit).


Who can provide this service?

The CCTV and online TSS monitoring service shall be provided by the Public Utilities board, Singapore approved vendors.

Asia (I)Monitoring Pte Ltd is an approved vendor for providing such services by Public Utilities board, Singapore.


Who need to have the access for this online system?

As per Public Utilities board, Singapore the following parties shall be shared with the user id and pass word for access to the web portal which monitor the Total Suspended Solid (online) and CCTV records .

  •   Main contractor representatives (ECO, Safety Officer and project manager)
  •   Developers
  •   Consultants
  •   Public Utilities board, Singapore
  •   Any other interested parties

What Asia (I) Monitoring can serve?>

  •   Install CCTV as in line with Public Utilities board, Singapore and Silt Imagery Detection System requirements
  •   Prepare CCTV installation checklist for the occupier and facilitate for submission to Public Utilities board, Singapore

Asia (I) Monitoring Pte Ltd can deliver the system either in one time sales basis or on monthly rental basis. Contact us for a quote.

Either Asia (I) Monitoring Pte Ltd is serving the client on one time sale basis or rental basis our technical team shall continue to give necessary support or maintenance services on regular basis.


What is the lead time?

On getting the formal approval from the contractor side Asia (I) Monitoring Pte Ltd need a lead time of one day for site visit. If the connection (CCTV and drain pipe) is too difficult Asia (I) Monitoring Pte Ltd shall take maximum of 3 days after the onsite visit.


What are details required from occupier?

The contractor shall provide to Asia (I) Monitoring Pte Ltd the following details in order to prepare the CCTV inspection checklist for submission to PUB

  •   BCA reference number for the project
  •   Contractor name (Occupier / factory owner)
  •   Contact person from the contractor side (name, email id and hand phone number)
  •   Developer name
  •   Project title as in BCA records
  •   Contractors headquarters address